3+1 Toilet Block 16 x 9 Ft Anti-Vandal Portable Toilet Block
25 in stock
Specifications
- SKU
- LEN-P-001050
- Dimensions (L × W × H)
- N/A
- Weight
- N/A
- Condition
- new
- Category
- All Toilet Blocks
Overview
A 3+1 split-use toilet block measuring 16×9 ft, supplied brand new and unused. Male and female facilities sit in two separate rooms, each behind its own external door, and the shell is anti-vandal throughout. The unit arrives plug-and-play. It was built for demanding site conditions — festivals, remote installations, construction zones and infrastructure projects that need high-capacity, robust sanitation.
Unit Overview
- Total size: 16×9 ft
- Condition: Brand new, unused
- Construction: Steel-clad, anti-vandal secure unit
- Finish: Powder-coated dark grey, giving a professional, low-profile appearance on site
- Chassis: Jack leg base, easing leveling on uneven ground
- Access: 2 external steel doors with lockable handles, so gents and ladies have separate entrances
- Internal equipment: Consumer electrical unit, with lighting and heating pre-installed
Room No. 1 – Gents (right/front when facing the unit)
- 3 × individual toilet cubicles
- 2 × urinals
- 3 × basins with water heaters
- 3 × openable small windows
- 2 × LED tube lights, switched
- 2 × wall-mounted tube heaters
- Toilet paper holders
Room No. 2 – Ladies (left side)
- 1 × toilet
- 1 × basin with water heater
- 1 × small openable window
- 1 × LED light tube
- 1 × wall-mounted tube heater
- Toilet paper holder
Connection and Commissioning
The block ships as a plug-and-play system. Electrical and water services are routed internally, so the work left on site is connecting to the site power and water sources. Commissioning is quick: the block is typically in use within 1–2 hours of placement, site dependent.
Applications
- Disaster relief and emergency response — sanitation that deploys fast, with heating already built in.
- Infrastructure projects — remote use, with the male and female WC layout kept separate.
- Public events — private, reliable facilities for temporary setups.
- Construction sites — covers the welfare and hygiene requirements typical of larger teams.
Transport and Placement
Delivery is available, and craning or lifting support can be provided on request. The placement point has to support jack legs and allow secure vehicle access. Lead time runs 7–14 business days as a rule, depending on location and stock.